Our soil built our porch for us

All we wanted was a little more soil for the garden.  Sure!  So we brought a yard of soil home from Campbell River in March after a medical appointment - no problem!  It wasn't until we came home that we remembered that we had a temporary porch last time we did this.  Problem! Without the extra width of the porch it was impossible to easily unload all that soil.  We had two options:

Option 1: Make many wheelbarrow trips of soil to be wheeled down our winding cedar path then dumped, drag the wheelbarrow back up then repeat.

Option 2:  Build our permanent front porch and install our fabricated dock ramp.  Then we could just wheelbarrow soil from the back of the truck to the end of the porch and dump it over the side, creating a pile of soil on garden level. No going up and down the hill controlling a load of soil.  Hummmmmm.   

Guess what option we chose!   First Jim pulled apart the old gangplank then started constructing the porch frame. Next we called Nate at our island mill and ordered enough cedar milled to make the porch decking (then picked it up only 3 days later).  We ate our Wheaties to make us strong and started planning how two people in their mid 60's could move the 16' long aluminum ramp from its resting place half way down our slope to its permanent location across from our front entry, a rise of about 18 vertical feet.


First Jim had to take the old temporary ramp off, saving all lumber for future projects, of course.

Next Jim installed the joists to support the new cedar porch
We engineered supports to help us shift the ramp sideways and line it up correctly
Meet "Red" , the awesome, convertible unpainted wagon/work cart Jim made from wagon components ordered online.  He clamped the ramp to Red and readied ropes so we could pull/ push it up the hill.



Jim screwed a yoke to the front of the cart, checked the ropes then directed me as I slowly inched the truck forward.  Red did a great job for us and we got the ramp a lot closer to its destination.

If it wasn't for COVID we could have asked a local construction crew across the street to help us for five minutes but that wasn't going to happen.  We managed the whole thing with just the two of us!

Jim put in temporary slides for the ramp to move across.
Great turning radius on Red.  We lined the ramp up and inched it towards the temporary supports.
Closer...
Touchdown!


Supports are removed. Ramp's in place and temporary plywood is screwed down across the porch.
At this point we still don't have a deck on the ramp.  That was part two of the day's fun.
Jim revamped Red to carry a 4' x 8' piece of decking weighing about 200 lb.  Two trips needed.
Except for this photo, we were both working.  I pulled using the handle while Jim pushed HARD
 from the back.  It was tough getting the load up our short steep slope but we managed. Twice!
And by the end of the day the decking was in place and screwed down permanently!
Notice the cherry tree.  This was March 22nd. No leaves even showing.
Ramp done!  Jim launched happily into decking the porch.  Oh the smell of fresh cedar!



Jim screwed the decking from the bottom through cleats he had added to the joists.  Having no nail heads showing on the porch deck surface inhibits rot where water would collect at the nail heads.  
All the deck framing is pressure treated. 
Just a week later we had snow.  The fibre/resin component deck is going to be a
 help in getting rid of grit, gravel and even snow before it enters the house.
Getting ready to put the last boards down, ensuring flashings are in place.
Late April.  Cherry tree in full bloom!  
When Jim designed the house he wanted it to feel like we were in the tree when we were on the porch.
The tree frames the left side of our house, creates summer shade and gives us easy picking for cherries. 
We hope to pick cherries from our porch this summer...if the crows don't get them first!  
P.S.  Permanent railings to come.

Enjoy spring.  We are!

Until next time...
Jim and Tricia Bowen

The 1,000 hour closet

You might remember our September 14, 2020 blog about our project to turn a section of a Malcolm Island 850 year old cedar tree into our front entry closet.  We have no clue how many hours we've put in to date or how many more we'll put in because it just doesn't matter. This piece is about Jim's passion for wood and creating a unique part of our home that will live long after we're gone.  Here's an update...

We found 'the' tree in 2018 then worked  over the months to cut it into quarters then started transforming it. The last blog left off wth four stunning pieces of cedar slowly drying.  Now is the time to get those pieces inside the house for a 'fitting' and final drying to ensure as little cracking as possible.  Of course, this unique piece of art is a labour of love that will take time to evolve. 


The four pieces slowly dried in the tent for the last year.  Now it's time to move them inside.
Jim's copying the stencil for each piece's layout so we can figure out details of where the door hinges.
Over the next couple of months we'll bring each piece in one at a time so Jim can chisel and carve them with much care to create an amazing almost hammered copper type surface.  The pieces aren't exactly light so moving the first one inside the house meant leap frogging it from sawhorse to sawhorse.... until we made it into the house.




We did it!


Jim created a cradle that he can pivot and lock in place at any angle while he's carving.  


I love our tree.  And I'm loving the cedar smell that lingers in the house when Jim's carving in the afternoon sun. Looks like glistening gold.  Stay tuned as we get each piece ready for the 'dry fit'.
Until then...
Tricia and Jim Bowen






















































Thursday, November 26, 2020

Just the pics....

 This island has so much beauty that I want to share more of it with you...


How can you resist?

My fans come running when I arrive.








It's not everyday that a barge with two houses arrives.

Tricky wind conditions eased so the tug could back the barge in.


And here are two of the locals watching.

Loads of neighbours were out to watch the spectacle.


The houses were trucked 1.5 km along a gravel road to the prepared lot.






That's the driveway they had to go up
Nickel Brothers did an amazing job!




Our new painted Sointula - Place of Harmony mural.



There kayakers enjoyed the fall weather too.


Another dinosaur spotted in town.  

Another dinosaur - no that's Jim working on his tie art a few months ago.


"School" is finally finished!  Of course Jim has other creative tie art ideas already underway.

I've moved away from bird house painting to canvas.  I'm having fun.

That's all for now, folks.

Cheers from Sointula.
Tricia and Jim Bowen
tandjbowen13@gmail.com